01B3000
ORIGINAL Portable Seizure
Well got pretty far in the past two days..
End of Day one, Everything only a little more than tacked into place. Ignore my buddy
The start of day two...
About halfway through, all the bottom welds are done
And by the end of day Two, Were here, Everything except whats down low by the cab (impossible to get to) and the back of the upper cross beam are welded in place.
Waiting on all the 6" oval lights that i ordered to come in, in the meantime, im gonna probably make all the holes for them and also do some of the wiring, get the wood for the bed and paint too.

End of Day one, Everything only a little more than tacked into place. Ignore my buddy


The start of day two...

About halfway through, all the bottom welds are done

And by the end of day Two, Were here, Everything except whats down low by the cab (impossible to get to) and the back of the upper cross beam are welded in place.


Waiting on all the 6" oval lights that i ordered to come in, in the meantime, im gonna probably make all the holes for them and also do some of the wiring, get the wood for the bed and paint too.